Cooling Tower Fill Replacement

Location: Kooragang Island, NSW
Job Type: Cooling Tower Fill Replacement
Client: Orica
Contractor: Marley Flow Control

The Problem

Orica’s cooling tower at the Kooragang Island facility required a full fill replacement to maintain thermal efficiency and structural integrity. The challenge was to complete the work within a tight shutdown window, coordinating with multiple contractors and ensuring zero disruption to plant operations.

Our Approach

Marley Flow Control executed a precision-based strategy to meet the shutdown deadline:

  • Fill Removal & Replacement:
     

    • Removed aging fill material from the tower’s wetted zone

    • Installed new Marley polypropylene splash fill bars and FRP grids for improved thermal performance

  • Structural Timber Repairs:
     

    • Replaced compromised timber within the wetted zone to restore integrity and support

  • Mechanical Overhaul:
     

    • Removed and reinstalled mechanical components including motor, driveshaft, gearbox, and fan

    • Conducted laser alignment to ensure optimal performance

  • Hardware Upgrades:
     

    • Replaced all bolts and anchor brackets in the wetted zone

  • Execution Methodology:
     

    • Fill removed bottom-up for safe access

    • New fill installed top-down to ensure alignment and airflow consistency

    • All works completed in accordance with contract specifications and safety protocols

The Result

This project demonstrated Marley Flow Control’s ability to deliver high-performance cooling tower upgrades under time-sensitive conditions, with precision and safety at the forefront.

​

  • Completed Within Shutdown Window

  • Zero Safety Incidents

  • Improved Cooling Efficiency

  • Restored Structural Integrity