Project Description

Client: Qenos
Location: Botany Bay
Year Completed: 2015
Job Type: Cooling Tower Design and Installation

The Qenos chemical plant at Botany Bay required a new cooling tower to meet their stringent material specifications. Marley Flow Control worked closely with the internal Qenos engineering team to adapt the existing piping and concrete basin to fit the new cooling tower. Our team successfully designed a system that provided access and safety features that met the strict OH&S requirements of the plant.

An off-site modular construction process significantly lowered the on-site duration to less than 3 weeks including the demolition of the old existing cooling tower and the installation of the Marley Flow Control cooling tower solution.